The Interim Public Utilities Minister is now actively considering the possibility of having stand-by generators and pumps at all water supply systems in the country to minimize the water cuts.

Mahendra Chaudhry said this step should have been taken a long time ago as people cannot just face water cuts every time there is a power cut or the water pumps breaks down.